An engineer changed the TPC Power Threshold for a wireless deployment from the default value to -65 dBm. The engineer conducts a new post deployment survey to v...


Cisco 300-425 Exam

Questions Number: 22 out of 106 Questions
20.75%

Question 22
An engineer changed the TPC Power Threshold for a wireless deployment from the default value to -65 dBm. The engineer conducts a new post deployment survey to validate the results. What is the expected outcome?







Previous Questions Next Questions


Premium Version