Engineer installed a customer unit for OceanStor 9000 equipment installation (a total of 5 OceanStor 9000 C Node, front and rear ends are 10GE TOE networking, o...


Huawei H13-629 Exam

Questions Number: 7 out of 72 Questions
9.72%

Question 7
Engineer installed a customer unit for OceanStor 9000 equipment installation (a total of 5 OceanStor 9000 C Node, front and rear ends are 10GE TOE networking, on-site installation TOE network card). Then connected the signal lines, power lines, and debugged the software. In the period of project tension, the hardware installation process has some of the following phenomena. Which of the following description of these phenomena is correct? (Multiple choice.)